www.scratch-builder.com

the Double Trouble build update

Assembling and detailing kit supplied motorcycle drive chain and sprockets.

Rear wheel, keeping aligned to frame, checking clearance with drive chain and brake mounts.

Rear end assemblies.

Added structural "integrity" with outside gussets and lightning holes fitted to frame cradle. 

the Double Trouble build first update for 2015

locating rear axel and drive chain.

Filling pinholes and flaws with putty and primer paint.

Back to the bench for 2015. 

Cutting tunnel on petrol tank.

Re-mastering parts.